It is an excellent place to turn your attention south. The Main Stem’s sequence gives way to a different urban canyon, where bridge approaches connect the Loop with the railway district.

History

A ferry served this vicinity before successive floating and swing bridges. The current crossing opened in 1916 as the Chicago River’s first double-deck bascule. The new leaves were built upright beside the old crossing, allowing much of the work to proceed while trains continued running.

How it works

The upper deck carries elevated railway tracks and the lower deck carries road traffic and sidewalks. Through trusses support the combined structure. During its construction, removing the old bridge and connecting the new upper deck required a carefully coordinated interruption to service.

What to notice

  • The relationship of rail deck and roadway
  • The north-side bridgehouses
  • The river junction immediately north