Chicago bridge openings

SPRINGRiver → Lake Michigan

Boats head out for the sailing season.

FALLLake Michigan → River

Boats return to winter storage.

ONE BRIDGE OPENINGUsually 8–12 minutes

The whole boat run takes longer.

DuSable Bridge raised over the Chicago River beside its limestone bridgehouses and the Wrigley Building.
01

DuSable Bridge at Michigan Avenue

South-bank Riverwalk beside the southwest bridgehouse.

Watch the leaves rise against the Wrigley Building from beside the southwest bridgehouse.

View on map ↗
Both leaves of Wells Street Bridge raised above sailboats, with the Merchandise Mart behind them.
02

Wells Street Bridge

South-bank Riverwalk between LaSalle and Wells streets.

The road and the elevated train tracks rise together. Look west for the Merchandise Mart behind the bridge.

View on map ↗
Dearborn Street Bridge in Chicago
03

Dearborn and Clark Street bridges

South-bank Riverwalk between Dearborn and Clark streets.

From between these two crossings, follow the boats as they move from one opening to the next.

View on map ↗
bridgehouse museum in Chicago
04

Inside the Bridgehouse Museum

99 Chicago Riverwalk, southwest tower of DuSable Bridge.

Get close to the working gears during a reserved lift-viewing session. The museum is closed for winter and plans to reopen in spring 2027.

Museum lift sessions ↗

BEFORE YOU GO

Timing is part
of the spectacle.

Check the schedule again on the day. A run depends on registered boats, and weather or mechanical issues can change the plan.

When do Chicago’s bridges open?

Scheduled boat runs take place in spring and fall. Spring runs move sailboats toward Lake Michigan; fall runs bring them back to river storage. The 2026 season has ended. Dates for 2027 have not yet been published; check the linked schedule for updates.

What time does the Michigan Avenue Bridge go up?

There is no fixed arrival time at Michigan Avenue. A published run time is the departure at the first bridge, and boats pass the other bridges in sequence. Weather, the number of boats and operating delays affect the timing. Allow a flexible morning.

How long does a bridge opening last?

CDOT describes an individual opening as typically 8–12 minutes. The full boat run takes longer because it passes a sequence of bridges. You may see one leaf rise or both, depending on the operation.

Can I watch a bridge lift for free?

Yes. Watch from the public Riverwalk or a riverbank, clear of the gates and working areas. The Bridgehouse Museum’s reserved indoor sessions are a separate, seasonal experience.