
DuSable Bridge at Michigan Avenue
South-bank Riverwalk beside the southwest bridgehouse.
Watch the leaves rise against the Wrigley Building from beside the southwest bridgehouse.
View on map ↗Boats head out for the sailing season.
Boats return to winter storage.
The whole boat run takes longer.

South-bank Riverwalk beside the southwest bridgehouse.
Watch the leaves rise against the Wrigley Building from beside the southwest bridgehouse.
View on map ↗
South-bank Riverwalk between LaSalle and Wells streets.
The road and the elevated train tracks rise together. Look west for the Merchandise Mart behind the bridge.
View on map ↗
South-bank Riverwalk between Dearborn and Clark streets.
From between these two crossings, follow the boats as they move from one opening to the next.
View on map ↗
99 Chicago Riverwalk, southwest tower of DuSable Bridge.
Get close to the working gears during a reserved lift-viewing session. The museum is closed for winter and plans to reopen in spring 2027.
Museum lift sessions ↗BEFORE YOU GO
Check the schedule again on the day. A run depends on registered boats, and weather or mechanical issues can change the plan.
Scheduled boat runs take place in spring and fall. Spring runs move sailboats toward Lake Michigan; fall runs bring them back to river storage. The 2026 season has ended. Dates for 2027 have not yet been published; check the linked schedule for updates.
There is no fixed arrival time at Michigan Avenue. A published run time is the departure at the first bridge, and boats pass the other bridges in sequence. Weather, the number of boats and operating delays affect the timing. Allow a flexible morning.
CDOT describes an individual opening as typically 8–12 minutes. The full boat run takes longer because it passes a sequence of bridges. You may see one leaf rise or both, depending on the operation.
Yes. Watch from the public Riverwalk or a riverbank, clear of the gates and working areas. The Bridgehouse Museum’s reserved indoor sessions are a separate, seasonal experience.